  1. The City of San Diego's contract lists ready mix at $198 to $223 a cubic yard, delivered. Treat that as the floor, since your one time order will usually cost more.
  2. A yard made from 90 lb bags costs $274.80 at Mission Valley. At the City price, that's $69.30 more than the truck.
  3. Multiply your yards by that gap. If the truck's extra fees are less, the truck is cheaper.
  4. Moving from 3,250 to 4,000 psi adds $7 a yard on the City sheet. That's $38.50 on a 20 by 20 foot driveway.
  5. A noisy pour can't start before 7 a.m. or run past 7 p.m. in the city, or land on a Sunday or legal holiday, without a permit.

You're on the phone with a ready mix plant, and the voice on the other end gives you a price per yard. Then come the short load fee, the wait fee and the Saturday fee. You have no idea which of those numbers is normal.

There's a price sheet you can hold it up against. It's the City's own contract for delivered concrete, and it puts a 3,250 psi yard at $205.50. Use it as your yardstick. Your quote will likely run higher, but now you can see how much higher, and on which line.

A San Diego Price Sheet Anyone Can Open

We looked for a San Diego County plant that posts a retail price list and didn't find one. The City's contract 10090052-24-C with Pedroza Ready Mix fills the gap. It was signed in 2024 for five years, with a cap of $30 million. The first two mixes on the list include delivery, with travel to and from the job.

City of San Diego ready mix contract, price per cubic yard unless noted
ItemPrice
2,500 psi (520-C-2500)$198.00
3,250 psi (560-C-3250)$205.50
3,250 psi pump mix (565-C-3250)$206.50
3,500 psi pump mix, 3/8 inch rock$212.00
4,000 psi, 1 inch rock$212.50
Class D, 7 sack, 1 inch rock$223.00
Order under 2 yards, extra per yard$20.00
Wait time past 4 minutes a yard$2.00 a minute
Opening the plant after 5 p.m. or before 7 a.m.$1,500 minimum
Opening the plant on a closed day for a weekend pour$1,500 a day

Read it for what it is. The City planned on 50,000 yards of the 3,250 psi mix alone over five years. You want five or six. The sheet is also two years old, and the contract lets the supplier ask for a yearly raise of up to 5%, or the San Diego inflation rate if that's lower. Two full raises would put that $205.50 yard at about $226.56.

So a home quote of $230 or $250 isn't out of line. A quote far under $198 should make you ask what's missing.

Truck or Bags, With the San Diego Math

The Mission Valley Home Depot sells a 90 lb bag of Quikrete concrete mix for $6.87. The Quikrete data sheet says that bag makes about 0.675 cubic feet. A cubic yard is 27 cubic feet, so it takes 40 bags and $274.80. The 60 lb bag at $4.58 lands on the same total.

Bags vs a truck at $205.50 a yard, before truck fees and sales tax
Cubic yards90 lb bagsBag costBreak even fees
0.520, 1,800 lb$137.40$34.65
140, 3,600 lb$274.80$69.30
280, 7,200 lb$549.60$138.60
3120, 10,800 lb$824.40$207.90
5.5220, 19,800 lb$1,511.40$381.15

The last column is the one to keep. It's the most you can pay in short load and delivery fees before bags come out cheaper. At one yard, a $75 fee already flips it. At 5.5 yards, the truck could carry $381.15 in fees and still tie.

Your plant will quote its own price, so redo it in one line. Subtract the quote from $274.80, then multiply by your yards. A $240 quote on 2 yards leaves $69.60 for fees.

Money isn't the only cost. Two yards is 7,200 pounds of bags to load, carry and mix. A slab also wants to go down in one pour, and bags come out a wheelbarrow at a time. Bags fit a post, a step or a small pad. For a patio or a driveway, call a plant.

A finished concrete patio slab behind a home
A patio this size is past the point where bags make sense. Work out the yards first, then call.

How Many Yards to Order

Multiply length by width by thickness in feet, then divide by 27. A 20 by 20 foot driveway at 4 inches is 133.3 cubic feet, or 4.94 yards. That's our example, so swap in your own sizes.

Don't order 4.94. The National Ready Mixed Concrete Association says to order 4% to 10% more than the plan math. Ten percent takes you to 5.43 yards, so call it 5.5. At $205.50 that's $1,130.25.

The ground is where orders come up short. The association's sheet on yield says an extra 1/8 inch in a 4 inch slab eats 3% of the order. On this driveway, a base that's half an inch low needs 0.62 more yards. That's $127 of concrete at the City price, and it's more than the whole cushion. Check the depth with a string line before you call.

Going thicker costs more too. The same driveway at 5 inches is 6.17 yards before the extra. Our driveway page covers when the added inch earns its keep.

What Stronger Mix, Color and Fiber Add

The City sheet prices each extra on its own line. That makes it easy to see which ones are cheap.

What each upgrade adds to a 5.5 yard ready mix order Bar chart of added cost on 5.5 cubic yards at City of San Diego contract prices. Color $165, 7 sack Class D mix $96.25, fiber $57.75, accelerator at 2 percent $55, 4,000 psi mix $38.50, accelerator at 1 percent $33, hot weather package $16.50. What Upgrades Add to 5.5 Yards Over the $205.50 a yard 3,250 psi mix, at City of San Diego contract prices Color in the mix, $30 a yard $165 7 sack Class D mix, $17.50 a yard $96.25 Fiber, $10.50 a yard $57.75 Accelerator, 2%, $10 a yard $55 4,000 psi mix, $7 a yard $38.50 Accelerator, 1%, $6 a yard $33 Hot weather package, $3 a yard $16.50 Our math, 20 by 20 ft slab. Bars start at 0.
Strength is a small line on the bill. Color is the big one.

Strength is the bargain. The association says 3,500 to 5,000 psi is typical for most work, so 2,500 psi on a driveway saves very little. Going from 3,250 to 4,000 psi costs $38.50 on 5.5 yards.

An accelerator speeds up the set, which can help on a cool December morning. At 1% it adds $33. Color in the truck adds $165. If you're weighing a colored or patterned slab, our stamped concrete vs pavers post has the installed prices.

Steel and labor aren't on this sheet at all. Our San Diego concrete cost guide has rebar, dump fees, wages and full job totals.

Short Loads and the Clock

A mixer holds 8 to 12 cubic yards, so most home orders leave it half empty. Plants charge for that. The City pays $20 a yard extra, and only when an order is under 2 yards. Your plant sets its own line, and it may sit well above 2. Ask where it is before you settle on a size. A slightly bigger patio can cost less than the fee.

Then the clock starts. The City gets 4 minutes of unloading per yard, then pays $2 a minute. On 5.5 yards that's 22 minutes.

Now picture that with a wheelbarrow. At 3 cubic feet a trip, 5.5 yards is about 50 trips. Doing it in 22 minutes means a load every 26 seconds. Run half an hour over and the City's rate would add $60. If the truck can't chute straight into the forms, plan more hands or a pump before the truck rolls, and tell the plant so it sends a mix that fits the pump line.

  • Access. A loaded mixer weighs about 80,000 pounds. It may not make it over loose dirt, home curbs or a path. Never let it cross a new slab. See when to park on new concrete.
  • The street. If the job takes over a sidewalk, parking space or lane, the City wants a Traffic Control Permit. New ones can take about 15 business days.
  • Washout. Concrete rinse water can't reach the gutter or storm drain. The City's construction waste sheet lists penalties up to $10,000 a day per incident. Set up a lined spot to rinse tools and the chute.
  • Leftovers. On City jobs the supplier takes extra concrete away at no added cost. Ask if yours does, and what it charges.
Concrete finishing tools resting on a freshly poured slab
Tools and hands need to be in place before the truck backs in. The unloading clock doesn't wait.

San Diego Pour Hours and Holidays

The city noise code, Section 59.5.0404, bars building work that makes disturbing noise from 7 p.m. to 7 a.m. It also covers Sundays and legal holidays. You'd need a noise permit for any of those.

That matters this season. Thanksgiving Day, December 25 and January 1 are all on the city's legal holiday list. March 31, Farmworkers Day, is too, and it's easy to miss.

Saturday takes a call. The code section doesn't name Saturdays. The City's own noise permit page says all day Saturday in one line and evening hours in another. Ask Development Services before you book one. Then ask the plant, since a closed day opening costs even the City $1,500.

Will Concrete Get Cheaper?

Nothing in the federal numbers says so. The Bureau of Labor Statistics tracks what U.S. ready mix plants charge in its producer price index. It's national, so use it for the trend.

U.S. ready mix producer price index, each October
MonthIndexChange from a year before
October 2020290.8Start
October 2021305.9Up 5.2%
October 2022344.2Up 12.5%
October 2023378.7Up 10.0%
October 2024392.4Up 3.6%
October 2025392.9Up 0.1%
October 2026402.4Up 2.4%

The big jumps were 2022 and 2023. Prices have crept since, up 2.4% in the last year and 2.5% over two. The August to October 2026 figures are still preliminary. In the years shown, no October came in below the one before it. Waiting for a price drop has been a losing bet.

Corrections

"Ready mix runs $125 to $150 a yard." A national cost guide prints that for 3,000 psi, with delivery on top. The City of San Diego, buying by the tens of thousands of yards, pays $198 for 2,500 psi.

"The price per yard is the price." It's the first line. Short load, wait time, Saturday opening and extras come after it. Ask for all of them in one quote.

"Concrete is no good after 90 minutes." The industry standard dropped that fixed limit in its 2021 edition. The buyer or the plant now sets a time limit, and it goes on the delivery ticket.

"Add water so it flows." Too much water cuts strength and raises the odds of cracks, per the association's ordering sheet. The plant also can't answer for a mix you changed on site. Order the slump you need.

What to Say When You Call the Plant

  1. Give the street address, the slab size and the yards with your cushion added.
  2. Ask for the price per yard at 3,250 and at 4,000 psi, so you see the gap.
  3. Ask where the short load line is and what the fee is under it.
  4. Ask how many minutes of unloading you get per yard, and the rate after that.
  5. Ask about fuel, environmental and Saturday charges, and sales tax.
  6. Say how it'll be placed. Chute, wheelbarrow or pump changes the mix.
  7. Ask what happens to leftovers and where the driver can wash out.
  8. Get the total in writing, then compare it to $205.50 a yard.

Quick Clarifications

How much is a yard of ready mix concrete in San Diego?

The City of San Diego's contract lists $198 to $223 a yard, with 3,250 psi at $205.50. That's a bulk price from 2024. A single home order usually costs more, plus fees.

Is bagged concrete cheaper than a truck?

Not by the yard. Bags cost $274.80 a yard at Mission Valley, and the City pays $205.50 for a truck. Under about a yard, short load fees can flip it.

What is a short load fee?

It's what a plant adds when your order is under its minimum. The City contract adds $20 a yard under 2 yards. Other plants set their own line and fee.

How long do I have to unload a concrete truck?

The City contract allows 4 minutes per yard, then charges $2 a minute. Ask your plant for its own allowance before you book.

How many yards do I need for a 20 by 20 slab?

At 4 inches thick it's 4.94 cubic yards. Add 4% to 10%, so order about 5.25 to 5.5 yards.

Will concrete prices go down in 2026?

They haven't. The federal index for U.S. ready mix was up 2.4% from October 2025 to October 2026.

Search on Google? Add us and our concrete notes show up first.

Choose San Diego Concrete in Google's preferred sources

Next in Line

Not sure if your job is a bag job or a truck job? Send us the size and a photo of the access, and we'll help you work out the yards.

Who Said So

City of San Diego, Contract 10090052-24-C, As-Needed Ready-Mixed Concrete, pricing pages 7 to 9 (November 2026)
Home Depot, Mission Valley store, Quikrete bag prices (November 2026)
Quikrete, Concrete Mix 1101 Data Sheet (November 2026)
National Ready Mixed Concrete Association, CIP 31 Ordering Ready Mixed Concrete (November 2026)
National Ready Mixed Concrete Association, CIP 8 Discrepancies in Yield (November 2026)
National Ready Mixed Concrete Association, ASTM C94 Revises Time Limit to Discharge Concrete (November 2026)
U.S. Bureau of Labor Statistics, Producer Price Index, Ready-Mix Concrete Manufacturing, PCU327320327320 (November 2026)
San Diego Municipal Code, Section 59.5.0404 Construction Noise (November 2026)
San Diego Municipal Code, Section 21.0104 Holidays (November 2026)
City of San Diego Development Services, Construction Noise Permit (November 2026)
City of San Diego Development Services, Traffic Control Permit (November 2026)
City of San Diego Stormwater, Construction Waste Fact Sheet (November 2026)
HomeGuide, Concrete Delivery Cost (November 2026)

Get a Free Estimate

Tell us about the job. We call you, come out to look and give you a free written estimate.

Prefer to talk? Call 24/7 Phone (619) 374-2145.

American Polo Remodeling is your contractor on every job. One company, one contract, one person to call. American Polo Remodeling, CSLB #1084257, B General Building

All concrete notes

Service Area

Serving San Diego and Nearby

Free concrete estimates for homes in San Diego, CA and nearby.

24/7 Phone (619) 374-2145